Spine III: Correction, risk, and successors
Nodes in this graph
- P23 No handle control ⇒ no correction (proof)
- P24 Weakest handle capacity / CCI (proof)
- P25 Obedience ≠ corrigibility (proof)
- P26 Update without fixed point (proof)
- P13 Risk = Control − CCI (proof)
- P29 Self-control gap (proof)
- P27 Successor invariant chain (proof)
- P28 Missing invariant blocks safety (proof)
- Syntactic tiling ≠ import-preserving transport (proof)
- MB4 Correction legitimacy (bridge)
- MB5 Successor audit (bridge)
- MB7b (from Spine I) (bridge)
- MB7c Adversarial robustness (bridge)
- MB8 CEV / process convergence (bridge)
- From Spine II: P22b transport (other)
- From Spine I: P11 control, MB7b (other)
- Exports: CCI, Risk bound, SuccessorSafe, MB7c, MB8, TrueHarm bound (MB10) (other)
- FSHUT (other)
- FINT (other)
- FIMPACT (other)
- FQUANT (other)
- FDEB (other)
- P25A (proof)
- FELK (other)
- FCORR (other)
- PFORGE (other)
- MB10 (bridge)