Toy simulation

Fast multiresolution alignment toy: correction capture theater, vector CCI over handle levels, scripted bridge stressors (MB1–MB9).

Full experiment overview

Fast multiresolution alignment toy: correction capture theater, vector CCI over handle levels, scripted bridge stressors (MB1–MB9). Optimized for instrumentation economics, not deployment realism.

Headline findings

  • Passive telemetry alone is uncertifiable (belowThreshold); light_handles is minimum certifiable level on calibration seeds. Cited in ch33 (Certification Without Construction) and appendix “Experimental Evidence” (finding TS-1).
  • Reported correction acceptance can stay high while true uptake collapses (capture theater).
  • Hand-written red-team can false-pass; LLM episodic red-team false-passes less often in small sweeps.

How to read

Fastest map from bridge name to refusal signal and minimum handle level; scenarios are explicit, not emergent.